This document outlines the SAP S/4 HANA Production Execution confirmation process, specifically focusing on the implementation of scan-in and scan-out procedures using barcode scanning at various production stages.
Production Confirmation, in this SAP context, refers to the system transaction used to record the completion or progress of manufacturing operations, capturing actual production time per serial number, yield, scrap, rework quantities, and quality inspection results. The process aims to enhance traceability, improve production cost analysis accuracy, and integrate quality management feedback directly into the production workflow, primarily utilizing the Production Planning (PP) and Quality Management (QM) modules, with links to Plant Maintenance (PM) and Materials Management (MM).
Breakdown of key content covered in the document are:
- Scan In: This initial step uses USB scanners (or manual entry) to capture the Production Order, Operation Number, and Serial Number(s), typically by scanning barcodes, to record the start time of a specific production operation in SAP S/4 HANA. Selecting the correct functional location (production line) is also part of this step.
- Label Printing & Reprinting: Details the automated label printing process triggered by scan-in or scan-out actions. Configuration relies on SAP Z-tables linking materials, operations, and printers. A separate process allows for reprinting labels when necessary.
- Scan Out (Quality Inspection Results): This step confirms the completion of an operation by scanning units out. It captures the total production time, yield quantity, and crucially, PASS/FAIL inspection results. Failed results automatically trigger Quality Notifications and WIP Rework Orders (Order Type XPRM) in SAP, integrating PP and QM for traceability and rework management.
- Capturing Counter-Based Asset Usage: Describes using a specific SAP Fiori App for Plant Maintenance integration. Operators scan the Production Order and specific equipment (e.g., stencils) to log usage counts, enabling SAP to automatically trigger maintenance tasks based on predefined usage thresholds.
- Cross-Order Component Reverse Consumption: Outlines the procedure to reverse the consumption of unused, previously issued cross-order materials back into inventory using a dedicated application, ensuring accurate material stock levels.
- Feeder Validation: Explains a validation step using a custom transaction/app. It involves scanning feeder slot QR codes and material Handling Unit (HU) barcodes to ensure the correct components are loaded onto the correct feeders according to a master list, including checks for interchangeable parts and providing error feedback.
- Assign Child SN to Parent SN: Details the process of linking component serial numbers (Child SN) to the main assembly serial number (Parent SN) using scanning. This is critical for detailed traceability and is often a prerequisite validation check before subsequent operation confirmations can occur. The process includes checking existing links and dismantling incorrect ones.